Ships from Chengdu · one piece minimum Five categories · quote on enquiry Mon–Sat 9:00–18:00 CST 中文
Replies within 1 working day
Enquire
Store › Notes › Buying from China …

Buying from China for the first time: the six stages of one order

Enquiry, sample, order, production, inspection, shipment — what to confirm at each stage and where money usually leaks.

First-time buyers often assume the process is quote, pay, receive. A real order has six stages, and each one ends with a confirmation. Skip a confirmation and the problem appears right after it.

1. Enquiry: give conditions before asking price

Asking "how much is this" gets you nothing usable. Give three things: model or photo, quantity, and destination city or country. Without conditions there is no quote — only a range you will have to re-ask about later.

2. Sample: turn verbal promises into photographs

The point of a sample is not to judge quality in the abstract — it is to create a reference. Photograph colour, dimensions, packing, accessories and labels, and keep them. Every later check is measured against those photos, which beats any spoken description.

3. Order: the quotation must state what is included

Five items sit outside the unit price and are easy to miss: packing method, tax, freight, whether tooling or sample fees are credited, and the remedy for defects. Leave them out of the quotation and each one can turn into a surcharge later.

4. Production: check mid-run, not at the end

Pulling a sample halfway through costs far less than inspecting at the end. If the material is wrong and you only find out when everything is made, the rework and delay have already happened — all that is left is a compensation argument.

5. Inspection: sampling needs a rule

Inspection is not "open a few cartons". Define sample size, check items, what counts as critical versus minor, and the acceptance criteria. Without that, the result is just "looks fine".

6. Shipment: documents travel with the goods

Invoice, packing list and any certificate of origin must be ready before loading. Producing them after arrival usually costs more in demurrage and amendments than the paperwork is worth.

Read next

All notes →

How to tell whether a Chinese supplier really exports

Five checks you can run yourself, none of which depend on what the supplier says about itself.

What belongs in an inspection report, and what is filler

A report you can negotiate with needs five things. Miss one and it is just a polite "no problem".

Enquire